Toronto flooring installation starts under the floor
Every flooring installation starts with the subfloor. We screw down loose plywood or OSB, grind high spots, fill low spots with self-levelling compound and take moisture readings on wood and concrete. Then the floor goes in the way its maker specifies: click-lock planks float over underlay, engineered boards are glued or nailed, solid hardwood is nailed to the subfloor, tile is set in thinset and carpet is stretched over pad onto tack strip. Baseboard or quarter round goes back on at the end.

